In the wind power equipment manufacturing workshop, Engineer Li Ming was frowning at an inspection report—a 30-meter-long wind tower section showed significant bending after welding, with straightness deviation exceeding the allowable limit by 2.5 millimeters. “This is already the third quality incident this month,” he said helplessly. “Tra